Solar Power Plants120MWEPCGrid-Connected
120MW Utility-Scale Solar Plant in Southeast Asia

A utility-scale solar plant invested and built by the group — 120MW connected to the grid in 14 months, expected to generate about 210 GWh annually.
Located in an emerging Southeast Asian power market, this 120MW plant was invested, built and operated by Chenlong Holding. The team overcame rainy-season construction and cross-border logistics challenges, completing the project in 14 months.
The plant is expected to generate about 210 GWh annually — cutting roughly 170,000 tons of CO2 emissions and supplying clean power to 80,000 local households.